Workshop technical transformation case: Lianyungang Tongwei
On March 6, 2025, Lianyungang Tongwei Feed Co., Ltd. undertook a new workshop technical renovation and installation project, which included the replacement of fan housings, dehumidifying fans, and the ultra-micro grader assembly. Trial production with materials began on March 28, 2025. After trial operation with materials, the client confirmed that the equipment was running stably and the production capacity met the contractual requirements. The project passed acceptance.
Workshop technical transformation case: Nantong Bada
On February 20, 2025, Nantong Bada Feed Co., Ltd. undertook a new workshop pulse jet technology upgrade and installation project, including the replacement of air tanks, solenoid valves, jet nozzles, and pulse jet repositioning. Trial production with materials commenced on March 14, 2025. Following trial operation with materials, the client confirmed on March 15, 2025, that the equipment was operating stably and that the production capacity met the contractual requirements. The project passed acceptance.
Workshop technical transformation case: Huanggang Oriental Hope
In June 2023, Huanggang Dongfang Xiwang Nutrition Co., Ltd. underwent a workshop technical renovation project. The main contents of the project included the installation of a hoist on the second floor of the workshop, the installation of an auger on the third floor, a high-level faucet and tee boxes, and electrical control system upgrades. The client confirmed on June 21, 2023, that the technical renovation project was functioning normally after the materials were put into use.
Hengrun 150 Ultrafine Grinding Technology Upgrade Case: Yangjiang City Dahai Aquatic Feed
In May 2023, Yangjiang Dahai Aquatic Feed Co., Ltd. undertook the Hengrun 150 ultrafine grinding technology upgrade project. The main contents of the project were the demolition and upgrading of the old equipment and the installation of new equipment. The project started trial production with materials in February 2023. After the trial production with materials, the owner confirmed on June 19 that the equipment was operating stably and the production capacity reached the contractual agreement. The project passed the acceptance inspection.
Workshop technical transformation case: Ningbo Tianbang
In December 2021, Ningbo Tianbang Feed Co., Ltd. underwent a workshop technical renovation project, which involved dismantling seven existing 110cc ultrafine production lines, one 150cc ultrafine production line, and three extrusion lines. Four SWFL180 ultrafine production lines were installed, including the installation of ultrafine main units, cyclone separators, pulse dust collectors, and fans. Three extrusion cooling systems and one 2-mixing system were also installed. Production commenced on January 20, 2022. After 30 days of operation, the client confirmed stable equipment operation and that the contracted production capacity had been achieved; the project was then accepted.